   INTERNATIONAL

Creation of a heating network (DSP) picking up the heat generated by the new EDF power plant.

• Recovery of about 4 MW of power (recycled energy).

• Creation of backup heater.
• A need of 10 months per year in heating/ECS covered.

Know more >

CITY OF MARÉ 

NEW-CALEDONIA

Study for the construction of biomass heating in cogeneration on the SNN industrial site (production of essence of santal and oil)

Know more >

CITY OF CHARLEROI

BELGIUM

Know more >

Study of the opportunity of creating an energy production plant (cogeneration & gas heaters) to serve the public infrastructures of Charleroi:

Exhibit palace, Fine arts palace and projected Conference centre.

CITY OF KALOUGA

RUSSIA

Prospective mission for leasing the Urban heating of Kalouga and improving its energy efficiency.

Pursuant to the overview report, Egis Bceom is continuing negotiations with local authorities via Dalkia.

Know more >

Service start-up of energy recovery centres from wastes and biomasses for CNIM UK, of which we shall reference three missions that took place on different sites:

• South London - Beddington:   17.6 t/hr for 275,000 t/yr, 24 MWe.

• Leeds - Yorkshire:   20.5 t/h for 214,000 t/yr, 15.5 MWe.
• Wilton - Middlesbrough:  29.2 t/h for 470,000t/yr, 50 MWe.

CNIM UK  -  THE UNITED KINGDOM

FOGGIA SITE -  ITALY

Service start-up and supervision of operations of a biomass unit.

HOOGEZAND SITE -  NETHERLANDS

Service start-up and tests on waste gasification site, the facility optimisation operations and accompaniment and operator training.

LEROUX  & LOTZ TECHNOLOGIES

NARVA THERMAL UNIT  -  ESTONIA

Service start-up of BOP steam and water systems, delegated management of operations teams.

THERMAL UNIT OF MAJUNG AND TANJUNG BIN  -  CHINA

Support for coordination of operations in test phases.

NUCLEAR PLANT OF NINGDE ET YANGJIANG  -  CHINA

Assistance to instructing party for assembly of TEU-TEP AND TESTING systems.

ALSTOM

BOUYGUES E&S 
GIBRALTAR

Service start-up of six motor-generator units of 14 cylinders and 300 t each of a new generation power plant.  With its 80 MW and 3.4 MW of “dual-fuel" heat recovery, it ensures energy independence to the 30,000 inhabitants of Gibraltar for the coming 30 years

POLYSIUS  (THYSSENKRUPP GROUP) 
FA2 BENI MELLAL CLIMATE PROJECT -  MOROCCO

Head of clinker production units as part of project industrial service start-up.

TECHNIP  
KONIAMBO KONE  -  NEW CALEDONIA

Mechanical supervision (construction/tests) of a pyrometallurgical plant.

• Electromechanical equipment service start-up,

• Management of piping package tests,
• Head of construction in Utilities and Commons zone,

• HSE follow-up.